CONSTRUCTION OF SECOND AVENUE SUBWAY
Construction of two bored tunnels each with a diameter of approximately 22 feet-1 inch, two shafts, site preparation, open-cut excavation (900’ x 70’ x 70’), slurry and secant walls, utility relocation and restoration, temporary dewatering and ventilation systems, maintenance and protection of traffic and temporary road decking.
Client: NYCT